CalculatorAsphalt

Concrete Column Calculator

Cylinder volume for round columns, piers and sonotube pours.

Quick answer: Round column volume = π × (diameter ÷ 24)² × height ÷ 27 cu yd. A 12 in sonotube uses one 80 lb bag per 7.7 in of height.

How to use this calculator

  1. Enter Diameter in in — or tap a preset badge to auto-fill a typical value.
  2. Enter Height in ft.
  3. Enter Number of columns.
  4. Press Calculate. The highlighted row is your order quantity; the note beneath it translates the number into real-world terms.

Formula & constants

Round column volume = π × (diameter ÷ 24)² × height ÷ 27 cu yd. A 12 in sonotube uses one 80 lb bag per 7.7 in of height. Every default in the fields above is editable — when your supplier’s spec sheet lists a different density, coverage rate or price, enter that number instead. The waste and compaction allowances follow common trade practice; see our methodology page for the derivation of each formula and the standards it references.

Worked example. With diameter = 12 in, height = 10 ft, number of columns = 1, the calculator returns:
Volume0.29 cu yd
80 lb bags14 bags

Where this fits in the project

Concrete work starts below grade: excavation, then a compacted gravel base for drainage, formwork, rebar where the slab spec requires it, then the pour. Order by cubic yard and round up — a short load fee costs more than surplus material.

How this connects to your project

No quantity stands alone — each material in the chain depends on the ones around it. These are the planning steps that pair with the concrete column calculator:

Frequently asked questions

What size sonotube for a deck post?

10–12 in for typical decks; the footing below often flares wider per code (e.g. Bigfoot forms).

How many bags per foot of 12 in tube?

1.55 bags of 80 lb mix per vertical foot.

Last verified: — prices reflect current national averages. See our methodology.

Estimates are for planning. Material densities, coverage rates and prices vary by region and supplier — confirm final quantities before ordering, and check local code where structural or electrical work is involved.