Concrete Footing Calculator

Cubic yards for strip and pad footings from length, width and depth.

Quick answer: Strip footing volume = length × (width ÷ 12) × (depth ÷ 12) ÷ 27 cu yd. A 16 × 8 in footing uses one cubic yard per 30 linear ft. Footings must bear below frost line.

How to use this calculator

  1. Enter Footing length in ft.
  2. Enter Width in in.
  3. Enter Depth in in.
  4. Press Calculate. The highlighted row is your order quantity; the note beneath it translates the number into real-world terms.

Formula & constants

Strip footing volume = length × (width ÷ 12) × (depth ÷ 12) ÷ 27 cu yd. A 16 × 8 in footing uses one cubic yard per 30 linear ft. Footings must bear below frost line. Every default in the fields above is editable — when your supplier’s spec sheet lists a different density, coverage rate or price, enter that number instead. The waste and compaction allowances follow common trade practice; see our methodology page for the derivation of each formula and the standards it references.

Worked example. With footing length = 10 ft, width = 16 in, depth = 8 in, the calculator returns:
Volume0.33 cu yd
80 lb bags15 bags

Where this fits in the project

Concrete work starts below grade: excavation, then a compacted gravel base for drainage, formwork, rebar where the slab spec requires it, then the pour. Order by cubic yard and round up — a short load fee costs more than surplus material.

How this connects to your project

No quantity stands alone — each material in the chain depends on the ones around it. These are the planning steps that pair with the concrete footing calculator:

Frequently asked questions

How deep must footings be?

Below frost line — 12 in in the South to 48+ in in northern states. Local code governs; heaving destroys shallow footings.

How wide should a footing be?

Twice the wall width as a rule of thumb: 16 in under an 8 in wall on average soils.

Last verified: — prices reflect current national averages. See our methodology.

Estimates are for planning. Material densities, coverage rates and prices vary by region and supplier — confirm final quantities before ordering, and check local code where structural or electrical work is involved.