CalculatorAsphalt

Deck Calculator

Deck boards, joists and fasteners from deck dimensions.

Quick answer: Board rows = deck width ÷ (board width + gap); each row is one deck-length board equivalent. A 5.5 in board with 1/4 in gap covers 5.75 in of width. Add 10% cut waste.

How to use this calculator

  1. Enter Deck length in ft.
  2. Enter Deck width in ft.
  3. Enter Board width in in.
  4. Press Calculate. The highlighted row is your order quantity; the note beneath it translates the number into real-world terms.

Formula & constants

Board rows = deck width ÷ (board width + gap); each row is one deck-length board equivalent. A 5.5 in board with 1/4 in gap covers 5.75 in of width. Add 10% cut waste. Every default in the fields above is editable — when your supplier’s spec sheet lists a different density, coverage rate or price, enter that number instead. The waste and compaction allowances follow common trade practice; see our methodology page for the derivation of each formula and the standards it references.

Worked example. With deck length = 10 ft, deck width = 10 ft, board width = 5.5 in (2x6 / composite), the calculator returns:
Deck boards232 lin ft
Joists (16 OC)9 joists
Screws (approx)350 screws

Where this fits in the project

Framing quantities chain together: footings support posts, joists set the deck frame, and surface boards follow. Price hardwood and specialty stock in board feet, sheet goods by the sheet.

How this connects to your project

No quantity stands alone — each material in the chain depends on the ones around it. These are the planning steps that pair with the deck calculator:

Frequently asked questions

How many linear feet of decking per sq ft?

About 2.1 lin ft of 5.5 in boards per sq ft of deck, before the 10% cut allowance.

What gap between deck boards?

1/4 in for drainage on dry lumber; green pressure-treated boards can be laid tight — they shrink to a gap.

Last verified: — prices reflect current national averages. See our methodology.

Estimates are for planning. Material densities, coverage rates and prices vary by region and supplier — confirm final quantities before ordering, and check local code where structural or electrical work is involved.