CalculatorAsphalt

Excavation Calculator

Dig volume in bank and loose cubic yards, with swell and truckload counts.

Quick answer: Bank volume = length × width × depth ÷ 27 cu yd. Soil swells 15–30% when excavated — haul the loose volume, not the bank volume. A 12 cy tandem hauls ~9.5 bank yards of typical soil.

How to use this calculator

  1. Enter Length in ft.
  2. Enter Width in ft.
  3. Enter Depth in ft.
  4. Enter Swell in %.
  5. Press Calculate. The highlighted row is your order quantity; the note beneath it translates the number into real-world terms.

Formula & constants

Bank volume = length × width × depth ÷ 27 cu yd. Soil swells 15–30% when excavated — haul the loose volume, not the bank volume. A 12 cy tandem hauls ~9.5 bank yards of typical soil. Every default in the fields above is editable — when your supplier’s spec sheet lists a different density, coverage rate or price, enter that number instead. The waste and compaction allowances follow common trade practice; see our methodology page for the derivation of each formula and the standards it references.

Worked example. With length = 10 ft, width = 10 ft, depth = 1 ft, swell = 25 %, the calculator returns:
Bank volume3.7 cu yd
Loose volume4.6 cu yd
Truckloads (12 cy)1 loads

Where this fits in the project

Earthwork precedes everything: dig volumes set the budget for hauling and determine imported fill or base gravel. Bank volume expands when dug (swell) and imported fill shrinks when compacted — use the truckload calculator on loose volume, not bank volume.

How this connects to your project

No quantity stands alone — each material in the chain depends on the ones around it. These are the planning steps that pair with the excavation calculator:

Frequently asked questions

What is swell factor?

Excavated soil occupies more volume than in-ground (bank) soil — typically 20–30% more. Hauling is priced on loose yards.

How much does an excavator dig per hour?

A mid-size machine moves 30–60 bank cy/hour in open cutting; trenching and tight access cut that in half.

Last verified: — prices reflect current national averages. See our methodology.

Estimates are for planning. Material densities, coverage rates and prices vary by region and supplier — confirm final quantities before ordering, and check local code where structural or electrical work is involved.