CalculatorAsphalt
🌐 English · Español · Italiano · Deutsch

Portland Cement Concrete

The rigid paving and structural material: portland cement, sand, coarse aggregate, and water, ordered by the cubic yard. A yard weighs about two tons and equals roughly 45 bags of 80 lb mix. Cures by hydration, reaching design strength at 28 days per ACI practice.

Where this appears in real estimates

This term isn't trivia — it's a working variable. These tools use it directly:

Go deeper

Reviewed: · Part of the CalculatorAsphalt Construction Glossary · Sources: see methodology & standards.