Complete Asphalt Driveway Project
This is the whole project as estimators actually run it — each step feeds the next, and the right tool is embedded exactly where you need it.
Step 1: Measure & mark
Stake the footprint and measure. Irregular shapes: split into rectangles. cost per square foot calculator.
Step 2: Excavate 9–11 inches
Dig to design depth (3 in asphalt + 6–8 in base). Haul loose volume, not bank. run the numbers with our excavation tool.
Step 3: Import & compact base
Dense-graded stone in 4-inch compacted lifts to 6–8 inches. gravel calculator.
Step 4: Order hot mix
145 lb/ft³ compacted + 8% compaction + 5% waste = order tonnage. the CalculatorAsphalt asphalt tool.
Step 5: Schedule delivery
Tandem loads of 15–22 tons; plan the paving day around truck cycles. truckload calculator.
Step 6: Price the job
Material + labor at 2026 rates; sanity-check contractor bids. asphalt cost estimate tool.
Step 7: Protect it (year 1+)
First sealcoat after 4+ weeks cure, then every 2–3 years. figure your sealcoating numbers.
Done? Compare approaches on the materials comparison pages, check your state's pricing, or dive into the engineer's field guide.
Reviewed: · methodology.