CalculatorAsphalt

Aggregate Calculator

General construction aggregate tonnage with adjustable density for any graded material.

Quick answer: Any granular material follows the same math: area × (depth ÷ 12) × density ÷ 2,000 = tons. Construction aggregates run 95–125 lb/ft³; enter the density from your supplier's sheet.

How to use this calculator

  1. Enter Length in ft.
  2. Enter Width in ft.
  3. Enter Depth in in.
  4. Enter Price per ton in $.
  5. Press Calculate. The highlighted row is your order quantity; the note beneath it translates the number into real-world terms.

Formula & constants

Any granular material follows the same math: area × (depth ÷ 12) × density ÷ 2,000 = tons. Construction aggregates run 95–125 lb/ft³; enter the density from your supplier's sheet. Every default in the fields above is editable — when your supplier’s spec sheet lists a different density, coverage rate or price, enter that number instead. The waste and compaction allowances follow common trade practice; see our methodology page for the derivation of each formula and the standards it references.

Worked example. With length = 10 ft, width = 10 ft, depth = 6 in, price per ton = 35 $, the calculator returns:
Volume1.85 cu yd
Material needed2.89 tons
Estimated cost$101

One ton covers ~35 sq ft at 6 in deep.

Where this fits in the project

Aggregate quantities feed the layers above them: after excavation, base material is placed in compacted lifts before asphalt or concrete goes down. Convert your tonnage to trips with the truckload calculator before scheduling delivery.

How this connects to your project

No quantity stands alone — each material in the chain depends on the ones around it. These are the planning steps that pair with the aggregate calculator:

Frequently asked questions

What density should I enter?

Use your supplier’s spec sheet: dense-graded base ~118–125, open-graded ~95–105, sand ~100 lb/ft³ loose.

Do I order by loose or compacted volume?

Order loose tons to fill the compacted design volume — the 5% allowance here covers typical consolidation.

Last verified: — prices reflect current national averages. See our methodology.

Estimates are for planning. Material densities, coverage rates and prices vary by region and supplier — confirm final quantities before ordering, and check local code where structural or electrical work is involved.