CalculatorAsphalt

Cabinet Calculator

Kitchen cabinet budget from linear feet at 2026 per-foot rates.

Quick answer: Cabinets price per linear foot of run: stock $100–$300, semi-custom $200–$650, custom $500–$1,200+. A 10×10 kitchen has ~20 linear ft of base + wall runs.

How to use this calculator

  1. Enter Cabinet run in lin ft.
  2. Enter Grade.
  3. Press Calculate. The highlighted row is your order quantity; the note beneath it translates the number into real-world terms.

Formula & constants

Cabinets price per linear foot of run: stock $100–$300, semi-custom $200–$650, custom $500–$1,200+. A 10×10 kitchen has ~20 linear ft of base + wall runs. Every default in the fields above is editable — when your supplier’s spec sheet lists a different density, coverage rate or price, enter that number instead. The waste and compaction allowances follow common trade practice; see our methodology page for the derivation of each formula and the standards it references.

Worked example. With cabinet run = 10 lin ft, grade = Semi-custom ($425), the calculator returns:
Low$3,188
High$5,313

Where this fits in the project

Coating and finish quantities are coverage-rate problems: true surface area divided by the product’s rated coverage, plus a waste allowance. Prep drives success — a coating over unprofiled or damp concrete fails regardless of quantity accuracy.

How this connects to your project

No quantity stands alone — each material in the chain depends on the ones around it. These are the planning steps that pair with the cabinet calculator:

Frequently asked questions

How do I measure cabinet linear feet?

Along the wall at counter height, base and wall runs measured separately then summed — corners count once.

Are stock cabinets worth it?

For rentals and budget remodels, yes — limited sizes force filler strips, but quality plywood-box stock lines last.

Last verified: — prices reflect current national averages. See our methodology.

Estimates are for planning. Material densities, coverage rates and prices vary by region and supplier — confirm final quantities before ordering, and check local code where structural or electrical work is involved.