CalculatorAsphalt

Topsoil Calculator

Cubic yards and tons of topsoil for beds, lawns and grading.

Quick answer: Topsoil = area × (depth ÷ 12) ÷ 27 cu yd, weighing ~1.1 tons/cy dry. Lawns need 4–6 in of quality topsoil; beds 8–12 in. One yard covers 54 sq ft at 6 in.

How to use this calculator

  1. Enter Area in sq ft.
  2. Enter Depth in in — or tap a preset badge to auto-fill a typical value.
  3. Press Calculate. The highlighted row is your order quantity; the note beneath it translates the number into real-world terms.

Formula & constants

Topsoil = area × (depth ÷ 12) ÷ 27 cu yd, weighing ~1.1 tons/cy dry. Lawns need 4–6 in of quality topsoil; beds 8–12 in. One yard covers 54 sq ft at 6 in. Every default in the fields above is editable — when your supplier’s spec sheet lists a different density, coverage rate or price, enter that number instead. The waste and compaction allowances follow common trade practice; see our methodology page for the derivation of each formula and the standards it references.

Worked example. With area = 10 sq ft, depth = 6 in, the calculator returns:
Topsoil needed0.19 cu yd
Weight0.2 tons

Where this fits in the project

Hardscape follows the same layer logic as paving: excavate, place compacted base and bedding sand, then set surface units. Bulk organics like mulch and topsoil are ordered by the cubic yard.

How this connects to your project

No quantity stands alone — each material in the chain depends on the ones around it. These are the planning steps that pair with the topsoil calculator:

Frequently asked questions

How much topsoil for a new lawn?

4–6 in minimum — grass roots need it. Thin soil over compacted subgrade produces permanently weak turf.

Screened or unscreened topsoil?

Screened for lawns and beds — rocks and debris removed. Unscreened only for rough grading.

Last verified: — prices reflect current national averages. See our methodology.

Estimates are for planning. Material densities, coverage rates and prices vary by region and supplier — confirm final quantities before ordering, and check local code where structural or electrical work is involved.