By Steve Axton, PE — Licensed Civil Engineer · Updated November 2026
Collect the intended equipment and route details for an electrician. A stated current alone does not establish the conductor or overcurrent protection.
Illustrative result. An example route has two segments of 35 and 25 ft, for 60 ft of measured route. That geometry is only one input for a qualified evaluation.

Gather readings, product labels and site details
Record identifiers, units and measured conditions before entering values into a screening worksheet. The nameplate, model number and project condition should remain available so a reviewer can find the original basis. Identify which values come from a documented measurement and which remain assumptions. List indoor, outdoor or other distinct service conditions as separate items when they matter.
Keep the inputs beside the Wire Sizing Worksheet calculator so its quantities can be checked against the original measurement. For an existing example of a clearly marked work scope, see solar pv systems with roofing materials. Use its boundary or measurement practice only where the conditions match.
Identify what the arithmetic actually represents
An inventory total, dimensional measurement or preliminary quantity is a defined input to a larger design decision. Retain the original units and write the interpretation next to each result. Mark related values that need a different method and professional review. Keep unverified equipment requirements outside the calculated input rather than rounding them into an assumed total.
Record equipment ratings, installation conditions, bonding and run details as requested by the designer. Keep measurements labeled as one-way route lengths.
Document what the number can support. A dimensional input or count can tell a reviewer what was measured, in which area and on which date. It cannot by itself determine whether the completed work is suitable or meets an applicable requirement. Include the source of every measured value and mark any entries based on plans or assumptions. A qualified reviewer can then test the assumptions using the adopted rules and the actual site conditions.
Record the source, location and date of the observation in a separate column. Leave a clear marker where the value has not been verified, and do not change it to zero to make the sheet total. A reviewer should be able to see the original measurement and identify the point where an applicable standard or site-specific decision enters the record.
Collect the circuit inputs
Identify the start and end of each run and whether the measured path includes detours. Share the plan with the electrician instead of using a guessed straight-line length for their review.
Bring route changes back to the electrician
If a section of the run changes after measuring, revise the route drawing and label the affected environment or installation condition. The new length is one input, and the appropriate materials and protection still require the qualified review. Keep the old and new route records with the proposal.
| Worksheet entry | What to record | When to revise |
|---|---|---|
| Measurement or scope | The measured limits and units | A drawing or field dimension changes |
| Product or rate | Exact model, coverage, quote or authority | The product, basis or conditions change |
| Calculated subtotal | Original result and any conversion | An input units check or independent reading changes |
| Order or reviewed amount | Selling increment or reviewed scope | Availability, review findings or inclusions change |
Worked example
- Identify the scope. Collect the intended equipment and route details for an electrician. A stated current alone does not establish the conductor or overcurrent protection.
- Set the example inputs and calculate. An example route has two segments of 35 and 25 ft, for 60 ft of measured route. That geometry is only one input for a qualified evaluation.
- Check the result against the plan or quote. Record equipment ratings, installation conditions, bonding and run details as requested by the designer. Keep measurements labeled as one-way route lengths.
- Write down the basis for the next person. Give the electrician the equipment documentation, plan and documented operating conditions.
Give the reviewer the source information
Share the site record, product data and documented demand or working conditions with the qualified reviewer. Ask what report is used for actual selection or installation and what can be ruled out from the current data. A comparable quote should identify the service proposed, relevant constraints, what requires verification, and the equipment or scope assumptions it uses.
Use the conduit fill worksheet and the electrical load worksheet to keep connected quantities in view. A project can need each of those estimates without allowing their outputs to be summed. Identify the unit and purpose on every line.
For a separate quantity on the same project, see hvac sizing worksheet. A built example in solar shingles vs solar panels shows why defining the finished area or work scope is more useful than estimating from a single outside dimension.
Keep screening quantities separate from approval
Place the measured results, owner-provided information and professional decisions in separate columns. Retain the reviewed version in case a source changes later. If a value is still uncertain, carry the uncertainty into the review instead of interpreting the screen as a final decision.
Review a recorded observation before revising everything
A real measurement may differ from a drawing, and an observation can apply to only the part of the site that was inspected. Mark the location and the conditions of the check, then determine which line needs revision. Bring a change in scope to the appropriate reviewer. Keep quantities that are actually comparable separate from values derived under different conditions.
This worksheet gives no conductor recommendation. Use a qualified electrician and the adopted electrical requirements.
Where this work connects to existing or planned asphalt, record the paving scope separately using the asphalt paving guide. Keep the location and work boundary in the estimate so any interface changes can be reviewed before purchase or construction.
Run your project numbers. Run the project inputs in the calculator for wire sizing worksheet. To check a connected line item, use conduit fill worksheet or electrical load worksheet. Transfer the quantities and units back to the same plan or quote before comparing totals.
Frequently asked questions
What should I measure first?
Collect the intended equipment and route details for an electrician. A stated current alone does not establish the conductor or overcurrent protection.
Is the result an approval, rating or design recommendation?
No. The worked number documents a measured or hypothetical input. A qualified reviewer must establish applicable requirements and assess the actual conditions separately.
Which assumption deserves a second check?
Record equipment ratings, installation conditions, bonding and run details as requested by the designer. Keep measurements labeled as one-way route lengths.
What should I give the supplier or reviewer?
Give the electrician the equipment documentation, plan and documented operating conditions.
Calculation method reviewed November 2026. Use the CalculatorAsphalt worksheet and its stated inputs to reproduce the example.