Concrete Calculator

Cubic yards of concrete plus 60 lb and 80 lb bag counts for slabs and pours.

Quick answer: Concrete is ordered by the cubic yard: length × width × (thickness ÷ 12) ÷ 27. One cubic yard equals about 45 bags of 80 lb mix. Add 5–10% for uneven subgrade.

How to use this calculator

  1. Enter Length in ft.
  2. Enter Width in ft.
  3. Enter Thickness in in — or tap a preset badge to auto-fill a typical value.
  4. Enter Price per cu yd in $.
  5. Press Calculate. The highlighted row is your order quantity; the note beneath it translates the number into real-world terms.

Formula & constants

Concrete is ordered by the cubic yard: length × width × (thickness ÷ 12) ÷ 27. One cubic yard equals about 45 bags of 80 lb mix. Add 5–10% for uneven subgrade. Every default in the fields above is editable — when your supplier’s spec sheet lists a different density, coverage rate or price, enter that number instead. The waste and compaction allowances follow common trade practice; see our methodology page for the derivation of each formula and the standards it references.

Worked example. With length = 10 ft, width = 10 ft, thickness = 4 in, price per cu yd = 150 $, the calculator returns:
Concrete needed1.23 cu yd
80 lb bags56 bags
60 lb bags75 bags
Estimated cost$185

≈ 1 ready-mix truck — bags stop making sense above ~1 cu yd.

Where this fits in the project

Concrete work starts below grade: excavation, then a compacted gravel base for drainage, formwork, rebar where the slab spec requires it, then the pour. Order by cubic yard and round up — a short load fee costs more than surplus material.

How this connects to your project

No quantity stands alone — each material in the chain depends on the ones around it. These are the planning steps that pair with the concrete calculator:

Frequently asked questions

How many 80 lb bags per cubic yard?

45 bags of 80 lb mix (each yields 0.6 cu ft). Above one yard, ready-mix delivery beats bagged on cost and quality.

How thick should a concrete slab be?

4 in for patios and walks, 6 in for driveways, 6–8 in with reinforcement where trucks load it.

Do I add extra when ordering?

Yes — 5–10% over calculated volume covers subgrade irregularity and spillage; a short-load fee costs more than the surplus.

Last verified: — prices reflect current national averages. See our methodology.

Estimates are for planning. Material densities, coverage rates and prices vary by region and supplier — confirm final quantities before ordering, and check local code where structural or electrical work is involved.