CalculatorAsphalt

Paver Calculator

Paver count plus base gravel and bedding sand for patios and walks.

Quick answer: Pavers per sq ft = 144 ÷ (paver length × width in inches); a 4×8 paver runs 4.5 per sq ft. Under them: 6 in compacted gravel and exactly 1 in of concrete sand. Add 10% cut waste.

How to use this calculator

  1. Enter Area in sq ft.
  2. Enter Paver size.
  3. Press Calculate. The highlighted row is your order quantity; the note beneath it translates the number into real-world terms.

Formula & constants

Pavers per sq ft = 144 ÷ (paver length × width in inches); a 4×8 paver runs 4.5 per sq ft. Under them: 6 in compacted gravel and exactly 1 in of concrete sand. Add 10% cut waste. Every default in the fields above is editable — when your supplier’s spec sheet lists a different density, coverage rate or price, enter that number instead. The waste and compaction allowances follow common trade practice; see our methodology page for the derivation of each formula and the standards it references.

Worked example. With area = 10 sq ft, paver size = 4x8 in, the calculator returns:
Pavers needed50 pavers
Base gravel0.28 tons
Bedding sand0.05 tons

Where this fits in the project

Hardscape follows the same layer logic as paving: excavate, place compacted base and bedding sand, then set surface units. Bulk organics like mulch and topsoil are ordered by the cubic yard.

How this connects to your project

No quantity stands alone — each material in the chain depends on the ones around it. These are the planning steps that pair with the paver calculator:

Frequently asked questions

How many 4×8 pavers per square foot?

4.5 — plus 10% for cuts along edges and curves.

What goes under pavers?

6 in compacted crusher run (8–10 for driveways), then 1 in screeded concrete sand — never more sand, it ruts.

Last verified: — prices reflect current national averages. See our methodology.

Estimates are for planning. Material densities, coverage rates and prices vary by region and supplier — confirm final quantities before ordering, and check local code where structural or electrical work is involved.