Inventory spaces by parking facility before comparing the inventory with the applicable accessibility requirements. A property-wide total can conceal distribution and accessible-route issues.
Illustrative result. Two facilities with 40 and 60 parking spaces contain 100 spaces combined. Keep 40 and 60 as separate input counts for the review.

Split the job by extent, material and treatment
On the drawing, identify the limits of work, the sections where material changes, and interfaces with existing surfaces. A measurement in square feet can carry through several quote lines, but it is only a sensible shared denominator if those lines cover the same extent. Keep areas with a separate repair, apron, tie-in or different thickness clearly identified.
Keep the inputs beside the Accessible Parking Inventory calculator so its quantities can be checked against the original measurement. For an existing example of a clearly marked work scope, see concrete driveway vs asphalt driveway. Use its boundary or measurement practice only where the conditions match.
Record the material and quantity basis
Check whether the estimate uses a compacted volume, an estimated mass, a product delivery receipt or a measured installed area. Preserve the original units next to any conversion. Group only entries with a common measurement basis and product definition. When dimensions are revised, update the limits before recomputing the amount.
Record designated accessible spaces, access aisles, routes and any specialty uses separately. Have a qualified reviewer determine how the standards apply.
Document what the number can support. A dimensional input or count can tell a reviewer what was measured, in which area and on which date. It cannot by itself determine whether the completed work is suitable or meets an applicable requirement. Include the source of every measured value and mark any entries based on plans or assumptions. A qualified reviewer can then test the assumptions using the adopted rules and the actual site conditions.
Record the source, location and date of the observation in a separate column. Leave a clear marker where the value has not been verified, and do not change it to zero to make the sheet total. A reviewer should be able to see the original measurement and identify the point where an applicable standard or site-specific decision enters the record.
Count spaces before reviewing a site
Record the boundaries and function of each facility, along with a dated inventory and the source of the measurements. Do not combine the lists until the reviewer confirms how the standard applies.
| Worksheet entry | What to record | When to revise |
|---|---|---|
| Measurement or scope | The measured limits and units | A drawing or field dimension changes |
| Product or rate | Exact model, coverage, quote or authority | The product, basis or conditions change |
| Calculated subtotal | Original result and any conversion | An input units check or independent reading changes |
| Order or reviewed amount | Selling increment or reviewed scope | Availability, review findings or inclusions change |
Worked example
- Identify the scope. Inventory spaces by parking facility before comparing the inventory with the applicable accessibility requirements. A property-wide total can conceal distribution and accessible-route issues.
- Set the example inputs and calculate. Two facilities with 40 and 60 parking spaces contain 100 spaces combined. Keep 40 and 60 as separate input counts for the review.
- Check the result against the plan or quote. Record designated accessible spaces, access aisles, routes and any specialty uses separately. Have a qualified reviewer determine how the standards apply.
- Write down the basis for the next person. Provide the dated site plan, count sheet and any recorded alterations to the accessibility reviewer.
Match the proposed quote to the known condition
Keep the estimated material quantity distinct from the approved construction or treatment scope. Identify any condition or area that may trigger a separate line, such as localized work around an edge or a distinct phase with different access. Ask the contractor to describe the contract measurement method, which ticket or other record supports it, and how revisions will be authorized.
Use the parking lot paving takeoff and the asphalt tonnage estimate to keep connected quantities in view. A project can need each of those estimates without allowing their outputs to be summed. Identify the unit and purpose on every line.
For a separate quantity on the same project, see pavement layers estimate. A built example in gravel driveway maintenance checklist shows why defining the finished area or work scope is more useful than estimating from a single outside dimension.
Keep screening quantities separate from approval
Place the measured results, owner-provided information and professional decisions in separate columns. Retain the reviewed version in case a source changes later. If a value is still uncertain, carry the uncertainty into the review instead of interpreting the screen as a final decision.
Preserve the assumptions for the second estimate
File the marked-up drawing and product data with the estimate. If the alternative uses a different measurement or basis, remove the old value before entering the new one. Write down why the revision was made and whether another line depends on it. When financial assumptions are involved, retain the original dated quote and distinguish its actual terms from the numbers used in an example.
This is general information, not legal advice. Consult a licensed attorney in your state. The example does not specify any required accessible space count.
Where this work connects to existing or planned asphalt, record the paving scope separately using the asphalt paving guide. Keep the location and work boundary in the estimate so any interface changes can be reviewed before purchase or construction.
Run your project numbers. Run the project inputs in the calculator for accessible parking inventory. To check a connected line item, use parking lot paving takeoff or asphalt tonnage estimate. Transfer the quantities and units back to the same plan or quote before comparing totals.
Frequently asked questions
What should I measure first?
Inventory spaces by parking facility before comparing the inventory with the applicable accessibility requirements. A property-wide total can conceal distribution and accessible-route issues.
Is the result an approval, rating or design recommendation?
No. The worked number documents a measured or hypothetical input. A qualified reviewer must establish applicable requirements and assess the actual conditions separately.
Which assumption deserves a second check?
Record designated accessible spaces, access aisles, routes and any specialty uses separately. Have a qualified reviewer determine how the standards apply.
What should I give the supplier or reviewer?
Provide the dated site plan, count sheet and any recorded alterations to the accessibility reviewer.
Calculation method reviewed November 2026. Use the CalculatorAsphalt worksheet and its stated inputs to reproduce the example. Reference for scope or method: Accessible Parking Spaces, U.S. Department of Justice.