Concrete Block Count: Take Off the Course Layout, Openings and Specials

By Steve Axton, PE — Licensed Civil Engineer · Updated November 2026

Start with the typical installed module, then count corners, openings and any specified special units separately.

Illustrative result. At 0.89 sq ft per design module, 80 sq ft divides to 89.89, about 90 units before a detailed course layout.

Concrete Block Count · Annotated numerical example from CalculatorAsphalt.com

Identify the geometry the form will actually enclose

Use the dimensions of the intended concrete element and group volumes by planned pour. Mark edges, changes in section and locations where components touch. Draw the boundary of each calculated block and mark shared faces. The sum should represent the intended physical volume once. A separately ordered product or change in mix must retain its own line even where the geometry is continuous.

Keep the inputs beside the Concrete Block Count calculator so its quantities can be checked against the original measurement. For an existing example of a clearly marked work scope, see concrete driveway vs asphalt driveway. Use its boundary or measurement practice only where the conditions match.

Preserve the unit basis through the purchase

Take volume into the quote in cubic feet or cubic yards as appropriate. Convert at the end if the drawing uses mixed units and retain the unrounded value. When a prepackaged product is specified, use the published mixed yield. When dispatch supplies a batch, check its ordering units and how the supplier handles quantities that fall between their increments.

Deduct openings in the area calculation but check where marked jamb and end units replace regular modules.

Choose base units before multiplying. For a volume that combines dimensions in feet and depth in inches, divide the inches by 12 to express depth in feet. Convert a result in cubic feet to cubic yards by dividing by 27. For surface area, keep the original dimensions and do not include depth. Write the correct dimensional unit beside the subtotal so a later change does not turn a volume into an area estimate.

Record the shape you measured before changing any dimensions. For the next estimate, break irregular geometry into labeled parts and compute them separately. Compare the sum with an outside dimension or an independent check from the drawing. If the readings are too uncertain to justify a single quantity, keep the affected section provisional. That is usually more informative than adding precision to a number derived from the wrong boundary.

Estimate masonry units

Order the precisely specified units for the jambs, corners or finishes that cannot be formed from normal stock. A face-area takeoff alone cannot identify that mix of pieces.

Check individual course counts at steps

At a wall step, count the last full unit and any separately identified end unit from the actual drawing. If the supplier must split a pallet of specials, record the price and lead time on its own line. Those changes are easy to miss in a rounded total based solely on face area.

Worksheet entryWhat to recordWhen to revise
Measurement or scopeThe measured limits and unitsA drawing or field dimension changes
Product or rateExact model, coverage, quote or authorityThe product, basis or conditions change
Calculated subtotalOriginal result and any conversionAn input units check or independent reading changes
Order or reviewed amountSelling increment or reviewed scopeAvailability, review findings or inclusions change

Worked example

  1. Identify the scope. Start with the typical installed module, then count corners, openings and any specified special units separately.
  2. Set the example inputs and calculate. At 0.89 sq ft per design module, 80 sq ft divides to 89.89, about 90 units before a detailed course layout.
  3. Check the result against the plan or quote. Deduct openings in the area calculation but check where marked jamb and end units replace regular modules.
  4. Write down the basis for the next person. Request dimensions, product series, standard block count, special shapes and available pack multiples.

Compare scope before changing the quantity

An estimate can include a measured allowance, but the need must be tied to the formwork, expected tolerances and accepted placement plan. Do not reduce approved dimensions to fit a quote. Record whether access, delivery, pumping, finishing and cleanup are in the price. Ask the contractor to itemize scope that belongs in another bid rather than making it disappear in a single unit rate.

Use the how much concrete do i need and the retaining wall block estimate to keep connected quantities in view. A project can need each of those estimates without allowing their outputs to be summed. Identify the unit and purpose on every line.

For a separate quantity on the same project, see wall stud takeoff. A built example in gravel patio with concrete pads shows why defining the finished area or work scope is more useful than estimating from a single outside dimension.

Work through the unit conversion once

Sketch the outline the calculation actually includes and keep a second column for the changes that will alter that outline. If two areas meet, assign the shared portion to one of them before summing. A change in representation should leave the quantity unchanged if both representations cover the same physical object.

Preserve the assumptions for the second estimate

File the marked-up drawing and product data with the estimate. If the alternative uses a different measurement or basis, remove the old value before entering the new one. Write down why the revision was made and whether another line depends on it. When financial assumptions are involved, retain the original dated quote and distinguish its actual terms from the numbers used in an example.

Use approved masonry drawings and system details. Face area does not determine safe wall design.

Where this work connects to existing or planned asphalt, record the paving scope separately using the asphalt paving guide. Keep the location and work boundary in the estimate so any interface changes can be reviewed before purchase or construction.

Run your project numbers. Run the project inputs in the calculator for concrete block count. To check a connected line item, use how much concrete do i need or retaining wall block estimate. Transfer the quantities and units back to the same plan or quote before comparing totals.

Frequently asked questions

What should I measure first?

Start with the typical installed module, then count corners, openings and any specified special units separately.

Should I round each measured section as I go?

Retain precise intermediate quantities for compatible sections. Sum them before rounding for the vendor. Keep materials, depths or treatments with a distinct specification on separate rows.

Which assumption deserves a second check?

Deduct openings in the area calculation but check where marked jamb and end units replace regular modules.

What should I give the supplier or reviewer?

Request dimensions, product series, standard block count, special shapes and available pack multiples.

Calculation method reviewed November 2026. Use the CalculatorAsphalt worksheet and its stated inputs to reproduce the example.

Leave a Reply