By Steve Axton, PE — Licensed Civil Engineer · Updated November 2026
I check the base at the door, through the middle and at the outlet before counting the paving work as ready. A patio can have the right height at the threshold and still hold water in the middle. That low spot is cheapest to correct before the screeded bedding and pavers cover it.
Quick answer. A string set at a 2% example grade drops 2.88 in. over 12 ft. At the halfway point, the planned drop is 1.44 in. If you measure 1.94 in. down from the level reference at that midpoint, the base there is 0.50 in. below its design line.

Separate slope, flatness and depth
The slope is the overall fall across the patio. Flatness describes local high and low spots around that designed plane. Depth is the thickness of the installed aggregate between the prepared soil and the top of the base. Each check answers a different question. A surface can fall toward an outlet and still contain a dip, and measuring the top alone cannot tell you how much aggregate lies below it.
Put intended elevations on the drawing before excavation. Confirm the approach at doors, steps, drains and neighboring pavement first, since these locations constrain the finished height. On the site plan, identify the point that will receive runoff. Compare the layouts for compact patio gardens when a bed narrows the available exit route. Do not assume a thin strip of planting will accept all runoff from the patio. Once you have set the bed and pavement elevations, measure the remaining mulch depth to avoid raising the bed edge unnecessarily.
CMHA’s guide specification calls for checking the aggregate base before bedding placement. It distinguishes surface tolerances from aggregate thickness and compaction. Work to the elevations and layer depths specified for your site and product. Treat a hillside, a chronically wet subgrade or a patio near a foundation as a site-specific drainage problem.
| Check | What to measure | What it can reveal |
|---|---|---|
| Overall fall | Elevation difference between the start and outlet | Drainage direction and the intended drop |
| Local flatness | Intermediate readings under a reference line or straightedge | Low spots between points with correct elevations |
| Finished depth | Top-of-base readings relative to recorded subgrade readings | Areas where the designed thickness was missed |
| Edge support | Location of the restraint relative to the prepared aggregate | An unsupported edge that can move |
| Layer choice | Product data for each aggregate and bedding material | A material swap that changes the assembly |
Set the reference before the final base layer
Start with a fixed reference mark off the work area. Record the elevation at the threshold and the elevation at the receiving edge. The reference should stay put when materials or tools move. A string can represent the elevation of the finished paver surface, or the planned base elevation. Label which one it represents, because mixing the two can shift a whole course by the thickness of the paver and bedding.
Take intermediate readings along more than one line, especially near a door, the middle of the field and any drain. Compare readings with the surfaces shown in the plan. Where two built features meet, verify both approach elevations before paving. A short cutoff may be appropriate for a paver at a corner, but adjusting the paver pattern cannot correct a poorly set base. The brick and stone pattern layouts help locate the exposed cut edge so it can be examined during the grade check.
Worked example: Find a half-inch dip
- Record the reference. Use a level reference at the high edge of a 12 ft run. Mark the project-specific design fall. This example uses 2%, or 0.02 ft per horizontal foot.
- Calculate the planned midpoint. At 6 ft, 6 × 0.02 = 0.12 ft. Multiply by 12 to get a midpoint change of 1.44 in.
- Check the actual midpoint. If the measured drop is 1.94 in. below the level reference, subtract 1.44 from 1.94. The base is 0.50 in. below the target at that point.
- Recheck after correction. The planned drop at the outlet is 12 × 0.02 × 12 = 2.88 in. After addressing the dip according to the project specification, check the corrected area and its adjoining surface before placing bedding.
Bedding sand should stay at the thickness called for by the system. An extra half-inch of bedding in the low area changes the layer beneath those units. The CMHA guide specification directs installers to correct depressions in the base before screeding. If a broad area consistently reads low, check whether the reference moved before deciding how much material needs correction.
Check how the base ends
Draw the outside limits of base support as a line around the project. This line can extend beyond the visible pavers, depending on the edge restraint detail. Calculate the volume using the actual layer footprint. A 12 × 16 ft paver field is 192 sq ft. If a specified base extends 6 in. past all four exposed sides, the base covers 13 × 17 = 221 sq ft. At an illustrative 4 in. designed thickness, the added 29 sq ft requires 9.67 cu ft in the finished layer. Base thickness and extension depend on the assembly.
Look at every point where the pavement meets grass, gravel or a curb. Follow the paver edging measurements to keep restraint lengths separate from the footprint. If the patio uses open gaps between pavers, follow the designed assembly and calculate the surface infill as a separate material. Surface gravel and bedding perform different jobs.
Recognize when the project needs a new grade plan
A shallow dip is one condition. Standing water beneath the work, yielding subgrade or an outlet blocked by a neighboring elevation are different conditions. Pause before covering them. Record where the water comes from and where it can leave. If the patio joins a vehicle surface, review the asphalt paving guide for the adjoining work and confirm the two surface elevations and drainage paths together. A grade calculation for a patio does not specify the driveway construction.
Next, work out the paver order from the field and cut list.
Use the paver base calculator for the specified layer volume. Run a separate sand quantity estimate for the bedding and use the paver layout estimator to price the surface units.
Frequently asked questions
Can I correct a half-inch base dip with bedding sand?
CMHA’s interlocking pavement guide specification calls for correcting depressions in the aggregate base before screeding. Use the bedding layer thickness specified for the selected paver assembly.
Can a pitched patio still retain water?
Yes. A pitched surface can have a local depression between its high edge and outlet. Check intermediate points against the intended plane as well as the total fall between endpoints.
Does the measured base footprint end at the paver edge?
It depends on the edge detail. Measure the aggregate area specified for the restraint and any extensions, then use that area in the volume calculation.
Should I use aggregate delivery volume to confirm the installed base thickness?
Check thickness from the prepared subgrade and finished top-of-base elevations. A delivery ticket records what arrived, and cannot show how the material was distributed or compacted.
Verified November 2026. Sources include CMHA PAV-TEC-002-22, Construction of Interlocking Concrete Pavements and CMHA PAV-TEC-009, Guide Specification for the Construction of Interlocking Concrete Pavement.